N_031.mp4 Link
: Connect a voltmeter to the main board (Black to MP15 , Red to MP4/MP5 ). Adjust potentiometers P4 or P5 to reach exactly 0.500V (500mV) .
: Remove old wires from the terminal block and connect the new assembly. n_031.mp4
The filename n_031.mp4 frequently appears in technical contexts related to crane systems, specifically associated with documentation for the DS 350 and EI 65 series Load Moment Indicators (LMI). : Connect a voltmeter to the main board
: Reconnect hoses and bleed the air from the hydraulic lines to ensure accurate readings. ⚠️ Critical Safety Checks The filename n_031
: Set the boom between 0 and 5 degrees. Use an inclinometer to verify the actual physical angle.
Before completing the assembly, verify these digital inputs:
The length sensor measures boom extension via a potentiometer in the cable reel.